Coach · every lift
Every weight.Automatic.Explained.
Reps climb, then the weight goes up. Miss, and it holds; keep missing, and Coach eases it back and builds it up again. Each lift's page shows where it is on the way to its next weight, and every step that got it there, in plain words.

Who's Coach?
The rules.Not a person.
Built into Loadpath for progressive overload, Coach raises every weight automatically as you get stronger, and tells you why.

Your log, your assistant
Ask any AIabout yourtraining.
Share your log and Coach's rules, as text, with the assistant you already use. Ask it for a workout or a programme, then open the link it gives you: Loadpath shows the plan before it saves anything. Nothing leaves your phone until you pick where.

Why has my overhead press stalled?
No new best in 4 sessions: at 51 kg your sets stalled at 5 and 6 reps of the 8 you need, while bench, rows and squats kept going up. Coach has eased it back to 46 kg. Build back from there, and if it sticks at 51 kg again, try a block of 4 × 5.
Reply written by an AI assistant from a demo log shared from Loadpath.
At the bar
Filled in.Just lift.
Today's weights are ready when you start, with warm-ups added for the heavy lifts. Hit your reps, tap once, rest. Every new best is called the second you hit it.

Coach suggests
Stalled?Here's theway out.
Coach tells a dip from a real stall. When a lift stops making new bests, it offers a new rep range, an easier weight or a swap to a close alternative, and shows what changes before you pick one.

And the restof it.
Session done.Summed up.
New records first, then what Coach changes for next time, lift by lift. On iOS 27 with Apple Intelligence, your iPhone also writes a one-line recap, and nothing leaves the device.
Proof it'sworking.
Each main lift's estimated max, tracked over weeks and months, with its personal bests and how far it has moved.
45 minutes?It fits.
Coach fits today's workout into 30, 45 or 60 minutes, or makes it an easier day. The main lifts stay in full, and anything trimmed holds its weight.
Back aftera break?
Coach offers a 10% lighter start and builds you back up.
Share a planas a link.
Send a saved workout, a programme or a finished session as a link, with a QR code. No weights, history or notes go with it.
PrivateiCloud sync.
Your data, on your devices, in your own iCloud.
No sign-up
Freecalculators.
The sums the app does every session, on the web. Your numbers stay in the link, so you can save it or share it.
5/3/1calculator.
Your training max and every set of weeks 1 to 4, with Boring But Big if you run it.
Work it out →GZCLPcalculator.
T1 and T2 starting weights, the four-day rotation, and what happens when you miss.
Work it out →1RMcalculator.
Your estimated max from any set, and the working weights from 95% down to 60%.
Work it out →Platecalculator.
What to load on each side of the bar, with the bar and plates your gym has.
Work it out →